Owner’s Name: Ibaera Capital
Location: Ghana
Year: 2019–2024
Ibaera’s Wa Gold Project is a 2.5Mtpa open cut mining operation with conventional CIL processing facility in Northern Ghana. Increva was appointed to assist Ibaera to prepare a bankable Feasibility Study document on the Wa Gold Project.
Owner’s Name: Ibaera Capital
Location: Ghana
Year: 2019–2024
Ibaera’s Wa Gold Project is a 2.5Mtpa open cut mining operation with conventional CIL processing facility in Northern Ghana. Increva was appointed to assist Ibaera to prepare a bankable Feasibility Study document on the Wa Gold Project.
Increva’s primary role was to produce an updated FS reflecting current market conditions and revised concepts that resulted from the scoping study update published in January 2019. As part of the update, an EPC package for the process facility was scoped and tendered.
In 2023, the Feasibility Study was revised to reflect updated market conditions and further study and test work conducted since the 2020 FS.
Increva’s primary role was to produce an updated FS reflecting current market conditions and revised concepts that resulted from the scoping study update published in January 2019. As part of the update, an EPC package for the process facility was scoped and tendered.
In 2023, the Feasibility Study was revised to reflect updated market conditions and further study and test work conducted since the 2020 FS.
Increva’s team provided:
- Desktop review of feasibility study documentation
- Preparation, issue and evaluation of EPC tender
- Review and repricing of bulk earthworks (TSF) and infrastructure
- Capital cost estimate update
- Coordination of the feasibility study document update.
Increva’s team provided:
- Desktop review of feasibility study documentation
- Preparation, issue and evaluation of EPC tender
- Review and repricing of bulk earthworks (TSF) and infrastructure
- Capital cost estimate update
- Coordination of the feasibility study document update.